The bar is being renovated from the floor up. There is a complete change of layout with new flooring, sink unit, water heater, work tops, wall panelling and shelves.The glass washer will be under the sink unit giving a much tidier set up.
Mike Baker and Nigel Knowles have been putting in a great effort doing vital work on the Club. Both the kitchen and bar floors have been feeling very soggy.
The kitchen floor was lifted and the floor and support timbers at the far end were found to be very rotten. The supports and about 50% of the floor timbers were replaced and new floor covering laid.